Inspection and debugging of mechanical water meter after installation

Feb 11, 2025

Leave a message

‌Check the sealing‌: After installation, check whether each joint is sealed to avoid water leakage.
‌Debug the water meter‌: Open the valve and observe whether the water meter is operating normally to ensure accurate counting.
‌Regular maintenance‌: Regularly check the wear and corrosion of the water meter, and regularly go to the technical supervision department for inspection to ensure the long-term stable operation of the water meter.

 

info-1000-1000